浅析开封王庵控导工程畸型河势整治措施(黄建国)
#trs_autoadd_1239863451796 {
margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体
}
#trs_autoadd_1239863451796 p {
margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体
}
#trs_autoadd_1239863451796 td {
margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体
}
#trs_autoadd_1239863451796 div {
margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体
}
#trs_autoadd_1239863451796 li {
margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体
}
/**---json--
{"":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"p":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"td":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"div":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"li":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"}}
--**/
1、工程概况:
该工程位于黄河下游开封段,大堤公里桩号为94+300-99+640,工程长度5340米,现有坝44道、垛3座,总计47个单元工程。1994年该工程在开封县境内开始修建;1998-1999年在开封郊区修建1-5坝;2000年按设计要求在该工程上首修建了10座垛,由于河势发生变化10座垛起不到引溜作用,之后按照上级要求将10座垛改建为6道坝,并于2000年至2001年完成-1-6坝的修筑;由于河势的上提,按上级要求又于2002年年底修建了-7--11坝;2003年8月洪水期间河势再次上提,大溜顶冲本工程的-10--11坝,工程上首坍塌发展较快,为控制河势又按上级要求抢修-12--14垛工程。该工程-6坝至33坝是按照整治流量5000m3/s修建,坝顶高程80.78米,-7--14垛是按大河流量4000m3/s修建,坝顶高程为80.09米
浅析开封王庵控导工程畸型河势整治措施(黄建国)