密云水库白河主坝沉降监测分析(罗阳春)

栏目:农林鱼水论文发布:2010-03-12浏览:2711下载232次收藏
  #trs_autoadd_1229063587812 { margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体 } #trs_autoadd_1229063587812 p { margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体 } #trs_autoadd_1229063587812 td { margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体 } #trs_autoadd_1229063587812 div { margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体 } #trs_autoadd_1229063587812 li { margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体 } /**---json-- {"":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"p":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"td":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"div":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"li":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"}} --**/

摘要:根据白河主坝45a的沉降监测资料, 选择具有代表性的标点, 绘制沉降过程线, 利用回归分析方法对时间—沉降量进行回归分析, 判断土石坝变形是否正常, 找出变形规律通过绘制沉降量的横断面、纵断面和平面分布图进行分析, 判断坝体是否因沉降不均匀而产生裂缝。

 

关键词:白河主坝 沉降 监测 分析

 

1 工程概况

 

白河主坝坝址为无阶地的箱形河谷。两岸陡立, 左岸坡为85°—90°, 右岸坡为70°—80°, 河床高程为94—98m。坝址区岩层主要有震旦纪片麻岩、震旦纪石英岩, 中生代石英岩节理发育, 渗透性强, 火成岩多呈岩脉状侵入岩层, 两岸岩层倒转, 倾向上游。由于构造发育,断层挤压破坏带和裂隙很发育, 河床砂卵石覆盖层深达44m, 平均渗透系数范围为500—800m/d。

 

白河主坝修建于1958年9月, 1960年9月竣工。该坝坝型为碾压式壤土斜墙土坝, 最大坝高66.4m,坝顶长960.2m, 坝顶高程160.0m, 坝顶宽8m, 最大坝底宽390m。由于坝基覆盖层透水性大, 覆盖层较厚, 最厚达44m, 坝基覆盖层采用了壤土齿槽、黏土水泥灌浆帷幕和混凝土防渗墙联合防渗的处理措施。1976年7月28日唐山发生7.8级强烈地震, 波及密云水库, 白河主坝上游保护层发生滑坡, 震后对白河主坝作了加固处理, 斜墙加厚。

 

2 变形监测设施情况

 

由于砂砾石坝体和地基的