#trs_autoadd_1235951638609 {
margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体
}
#trs_autoadd_1235951638609 p {
margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体
}
#trs_autoadd_1235951638609 td {
margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体
}
#trs_autoadd_1235951638609 div {
margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体
}
#trs_autoadd_1235951638609 li {
margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体
}
/**---json--
{"":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"p":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"td":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"div":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"li":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"}}
--**/
一、通道涵施工的场地布置
1、为把施工用机械、设备和材料顺利运进现场,并对其合理布置,达到人与物的统一,提高效率保证安全,除调查地形条件外,还调查所要经过的道路情况,道路宽度、弯道半径、路面状况,以便解决挖槽机械、重型机械进场的可能性。K41+186 4.5m×4.5m通道涵所需用到的材料有水泥、碎石、片石、钢筋等;所用到的机备、工具有搅拌机、发电机、模板等,考虑到台身高度,则水泥混凝土浇筑时还需用到吊车。那么相应地,哪里放水泥、哪里放碎石、哪里放钢筋……这些场地布置上的问题接着就要解决——首先就要调查地形,放料的地方既要方便浇筑时配料斗车的运输,又要满足运料汽车爬坡的难易程度等因素;除此,还要考虑到施工平台和工棚的布置,施工平台既要满足吊机、搅拌机等的合理布置,还要顾及到筑平台所产生的土方量或机械工时的大小。
2、地下障碍物与施工对周围影响的调查
在开工前对埋在地下的钢筋砼结构物和各种管道、电缆进行详细的勘察,有地下管线处在开工前先进行刨验工作,在施工之前加以排除。
二、基底处理
通道框架按明挖现场现浇砼施工法施工。此法为经验之谈。施工机械进场后,由测量人员放出开挖基坑边线、基顶边线,放样时,务必要求施工队管工旁站在现场记认,测量人员务必要具体地清楚地交代桩位及数据。之后采用机械配合人工开挖的方式开挖基坑。先用机械开挖至基底10~20cm后,再用人工开挖至设计基底,开挖放坡11,基坑长宽方向要比框架设计长宽方向各加lm,其中设40cm排水沟,另60cm为支撑模板的作业空间,严禁超挖回填,造成劳民伤财,另用潜水泵将基底水排出基坑以外,开挖土方退出施工现场,并对基坑底进行清除脏乱等东西后平整处理,保证无淤泥及杂物。
如经触探试验,测得基底地基承载力达不到设计要求时,则要对基底进行处理。经实践检验,总结出对K41+1864.5m×4.5m通道涵基底处理的方法值得参考。处理方法为:首先用片石封底,再分层填筑碎石并碾压,每一层灌砂用水冲密实。