凉头水电站增容改造分析(黄美胜)
#trs_autoadd_1225681891453 {
margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体
}
#trs_autoadd_1225681891453 p {
margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体
}
#trs_autoadd_1225681891453 td {
margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体
}
#trs_autoadd_1225681891453 div {
margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体
}
#trs_autoadd_1225681891453 li {
margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体
}
/**---json--
{"":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"p":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"td":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"div":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"li":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"}}
--**/
摘 要: 本文依据凉头水电站工程现状,提出通过改造引水系统,利用坝段水头,增加水电站的落差,并根据区域水文气象特点,利用年内的梅雨期和台汛期两个丰水期,适当扩大水电站的装机规模,从而提高水能资源利用率和电站经济效益。
关键词: 电站;增容改造;分析
一、工程概况
凉头水电站位于鳌江干流顺溪上游的吴垟乡凉头村。该电站为引水式水电站,兴建于1992年股份制开发建设水电站刚刚兴起之际,于1994年3月建成投产,以发峰电为主,多年平均发电量260万kw?h,其中峰电224万kw?h,谷电36万kw?h。1996年10月,王宅35kv升压站建成后,并入该升压站为大电网调峰。
该电站总装机容量80 0kw,装设两台冲击式机组,水轮机为cj2 2-w-55/1×7 b、发电机为sfw400 -6/850,设计水头220m,电气主结线为单元接线,坝址以上控制集雨面积7.6km2,水库总库容10万m3,兴利库容8万m3,坝型为浆砌石重力坝,坝高11m;引水系统总长1100m,其中引水渠道长650m,引水压力钢管长450m,压力钢管直径0.50m。在该电站水库上游