#trs_autoadd_1239586437734 {
margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体
}
#trs_autoadd_1239586437734 p {
margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体
}
#trs_autoadd_1239586437734 td {
margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体
}
#trs_autoadd_1239586437734 div {
margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体
}
#trs_autoadd_1239586437734 li {
margin-top: 0px; font-size: 12pt; margin-bottom: 0px; line-height: 1.5; font-family: 宋体
}
/**---json--
{"":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"p":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"td":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"div":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"},"li":{"line-height":"1.5","font-family":"宋体","font-size":"12pt","margin-top":"0","margin-bottom":"0"}}
--**/
一个工程项目从立项、规划、设计、审核到施工,及至工程竣工验收,资料归档管理,整个流程,环环相扣,任何环节都不能有丝毫闪失,否则其所引起的损失均是难以估量的。其中,作为施工这一至关重要的一环,是一个将设计意图转换为实际的过程,在此过程中,许多设计中考察欠缺,或是同实际情况有出入的问题都会一一凸现出来,甚至同以后使用维护相关的问题也会有所暴露,值得重视,更何况其任一道工序均会对整个工程质量产生致命的缺陷。因此,对于项目的现场施工管理,必须百分之百的重视、投入。
工程项目的现场施工管理,应该是个老生常谈的话题,从个人的观点出发,我认为要做好以下几方面的问题:
一、搞好施工前的各项准备工作
施工前,应根据投标时的工程量和工期情况,选定精良的设备和得力人员,同时,预筹项目部的组成,选派部分人员提前进驻工地现场,根据工程的实际情况,做好施工队伍进场前的各项准备工作,编写施工组织设计,并报监理单位审批。施工单位应不等、不靠,主动出击,搞好地方关系。施工期间,施工单位应尊重当地的风俗习惯,考虑工程施工对周围环境的影响,及时采取防护措施,避免给工程所在地造成环境污染。与当地村有联系的附属工程,施工期间和施工完毕后及时予以恢复,为当地群众提供方便,同时与当地干部多联系、多结合,做到关系融洽。施工过程中发现有影响工程施工的苗头,主动与建设单位协商,将问题处理在萌芽状态。稳定群众的情绪,减少当地群众对工程施工的干扰,为工程施工创造一个宽松的环境。
二、自觉接受监督和检查
施工单位进驻施工现场后,应严格按照基建程序施工,按照监理工程师的指令去做,与现场监理人员密切配合,自觉接受监理单位的检查、监督和管理,全过程接受建设单位和质量监督机构的监督与检查。加强对隐蔽工程和工程的关键部位、关键工序的检查,认真填写检查记录,确保工程质量和单元、分部工程验收及评定工作的开展。
三、加强自身的管理,确保工程施工的顺利进行
(一) 强有力的项目部是搞好工程施工的前提
施工合同签订后,施工单位